The world-famous Madison Square Garden (MSG) arena has a decades-long and counting relationship with Stonhard performing behind-the-scenes repairs to keep the New York entertainment center operating at full capacity. This long, reputable history solidified their decision to bring Stonhard onboard to take part in a $1 billion transformation project. After almost 50 years of use, the ‘Lower Bowl’ floor section was in poor condition, suffering from corroded concrete and peeling paint.
"Stonhard worked integrally with Turner Construction and other construction trades in order to turn over an outstanding product in an incredible time frame," said Lloyd Nolan, territory manager for Stonhard. "The 'dark summer' schedule was a nine-month to one-year construction schedule construction schedule compressed into three months. Communication was vital to the success of the project.”
Stongard TM provides a long lasting, durable floor that withstands throngs of foot and wheeled traffic in Madison Square Garden seating areas.
Stonhard met the challenge by replacing the existing floor with Stongard TM, an exceptionally durable, elastomeric, traffic-bearing flooring system. Stongard TM is a textured, durable, sophisticated surface that is easy to clean and maintain, and will provide a long-lasting surface to resist the throngs of foot and wheeled traffic at the arena. Elsewhere, MSG opted for Stonhard’s Stonclad system in the concessions area, choosing the seamless, sanitary system over quarry tile. Formulated specifically for general service areas, Stonclad systems are designed to withstand tough, heavy traffic environments, resisting slips and stains. Stonclad systems were also installed in the expo area, beer fridges and club corridors.
Stonhard floors are durable and slip-resistant with special formulations to meet the demands of food service in high volume facilities.
Concession areas benefit from the durability and hygiene of seamless Stonhard flooring.
Robust seamless flooring in freezer areas provide a sanitary, slip-resistant surface to withstand heavy use and extreme conditions.
Resinous floors in an escalator area provide slip resistance, easy cleaning, and durability for a safe, efficient, long-lasting solution.
Stonhard is committed to your meeting your schedule and deadlines. installation crews worked for three years during MSG’s ‘dark days’ to complete the renovation.
Stonhard seamless floors are built to withstand the heavy foot traffic of a bustling stadium environment.
In addition, Stonhard replaced elevator tower floors with Stonshield SLT, a durable, decorative epoxy system, with texture for slip-resistance. The transformation occurred over the course of four years, primarily in the offseason summer months, with Stonhard’s crew working around the clock to ensure a successful installation.
Want to print this project profile? Click here!
Subscribe to get alerts about future projects and news!
©2025 STONHARD. ALL RIGHTS RESERVED